East Hawaii News

8 lane closures scheduled during week of Jan. 10-16 on Big Island state roadways

Play
Listen to this Article
2 minutes
Loading Audio... Article will play after ad...
Playing in :00
A
A
A

Hawai‘i Department of Transportation announces the following 8 scheduled lane closures and road work projects on Big Island state roadways during the week of Jan. 10-16.

* * * * * * * * *

Vehicles are stuck in traffic because of tree trimming closing a lane on Highway 11 near Hilo. (Photo File: Kelsey Walling/Big Island Now)

HIGHWAY 11

HAWAIIAN OCEAN VIEW

  • SINGLE LANE CLOSURE possible in either direction, between mile posts 70 and 83, from 8:30 a.m. to 3 p.m. Jan. 12-16 for removal of existing striping, installation of centerline rumble strips, new striping and pavement markers.

PĀHALA TO NĀʻĀLEHU

  • SINGLE LANE CLOSURE possible in either direction, between mile posts 50 and 60, from 8:30 a.m. to 3 p.m. Jan. 12-16 for removal of existing striping, installation of centerline rumble strip, striping and permanent markers.

VOLCANO

  • SINGLE LANE CLOSURE possible in either direction, between mile posts 27 and 30 in the vicinity of Haunani Road and Kīlauea Military Camp, from 8:30 a.m. to 3 p.m. Jan. 12-16 for Hawaiian Electric installation of new powerline poles and lines.

HIGHWAY 19

ARTICLE CONTINUES BELOW AD
ARTICLE CONTINUES BELOW AD

Click here for details about emergency repairs between mile posts 3 and 15 on Hawai’i Belt Road.

HONOMŪ

  • SINGLE LANE CLOSURE possible in either direction, between mile posts 12.3 and 12.8, beginning at 8 a.m. Jan. 12 until further notice for emergency zone work and pavement repair.

PEPE‘EKEO

  • SINGLE LANE CLOSURE possible in either direction, between mile posts 11.5 and 11.7 in the vicinity of Overpass Road to Cane Road, from Jan. 10 through 6 p.m. Jan. 11 for emergency zone work and pavement repair.

HIHGWAY 190

ARTICLE CONTINUES BELOW AD

SOUTH KOHALA

  • SINGLE LANE CLOSURE possible in either direction, between mile posts 12.2 and 16.4, from 8:30 a.m. to 3 p.m. Jan. 12-16 for applying new striping.

WAIMEA

  • SINGLE LANE CLOSURE possible in either direction, between mile posts 0 and 1 in the vicinity of Lindsey Road and Lālamilo Farm Road, from 8:30 a.m. to 3 p.m. Jan. 12-16 for applying new striping.

HIGHWAY 2000

HILO

  • SINGLE LANE CLOSURE possible in either direction, between mile posts 0.5 and 2.2 in the vicinity of Kanoelehua Avenue and Komohana Street, from 8:30 a.m. to 3 p.m. Jan. 12-16 for painting asphalt curbs and direction arrows.

* * * * * * * * *

ARTICLE CONTINUES BELOW AD

Lane closure schedules can change at any time without notice. All projects are weather permitting.

A map of lane closures can be found online.

Sponsored Content

Subscribe to our Newsletter

Stay in-the-know with daily or weekly
headlines delivered straight to your inbox.
Cancel
×

Comments

This comments section is a public community forum for the purpose of free expression. Although Big Island Now encourages respectful communication only, some content may be considered offensive. Please view at your own discretion. View Comments