News

Highway 130 in Lower Puna to Open to Local Traffic

Play
Listen to this Article
2 minutes
Loading Audio... Article will play after ad...
Playing in :00
A
A
A

The Hawai‘i Department of Transportation (HDOT) is reopening Kea‘au-Pāhoa Road (Highway 130) from Malama Street to Kamaili Road to local traffic at the request of the County of Hawai‘i from 7 a.m. Tuesday, May 15, 2018. The reopening of Highway 130 was deemed crucial as Highway 132 was closed to through traffic at Pohoiki Road today, May 14, 2018.

Crack in Highway 130. PC: Ikaika Marzo

“The safety of those living in lower Puna is our number one priority,” said Gov. David Ige. “We will continue to support the County of Hawai‘i without reservation in their efforts to maintain transportation access for affected residents.”

Highway 130 from Malama Street to Kamaili Road in the vicinity of Leilani Estates was closed due to road cracking that could be related to potential fissures. Metal plates will be placed over the crackling from mile markers 14.4 and 14.6 to maintain two lanes of traffic. Time restrictions for access are necessary as HDOT and county employees must monitor conditions along the route. The limited local access will be permitted daily, between 7 a.m. to 6 p.m., as long as conditions allow.

Currently, the roadway appears stable; however, sulfur dioxide is emitting from the cracks. HDOT is investigating the installation of electronic monitors at these sites to monitor for heat and gas levels. Physical surveillance to ensure Highway 130 in the East Rift Zone is safe for local traffic will be conducted by HDOT and county employees while the route is open.

ARTICLE CONTINUES BELOW AD
ARTICLE CONTINUES BELOW AD

HDOT continues to work with federal, state, and county partners to prepare alternate routes for the areas affected by the Kilauea Volcano East Rift Zone Eruption. Planning for alternative routes includes the removal of one mile of solidified lava from Chain of Craters Road and the potential use of “lava bridge” technology on Highway 130. The lava bridge concept would involve the use of insulated mats that are heat resistant to 2000-degrees to maintain access to Highway 130 as long as possible.

The alternate routes using Highway 137 (Old Government Beach Road), Kahakai Boulevard in Hawaiian Beaches and Maku‘u Drive in Hawaiian Paradise Park are open and accessible to local traffic. The Old Government Beach Road is mostly unimproved gravel road. HDOT has assisted the County in grading of Highway 137 north of Highway 132 as a detour to Highway 130. Additional interim measures to maintain access to lower Puna may include reestablishment of cracked routes through the use of a combination of steel plates and fill (i.e., protective insulated material) to insulate the plates from heat or heat resistant concrete panels and active monitoring.

Updates on the preparation of potential alternate routes for lower Puna will be provided as the situation continues to develop.

ARTICLE CONTINUES BELOW AD

ADVERTISEMENT

Sponsored Content

Subscribe to our Newsletter

Stay in-the-know with daily or weekly
headlines delivered straight to your inbox.
Cancel
×

Comments

This comments section is a public community forum for the purpose of free expression. Although Big Island Now encourages respectful communication only, some content may be considered offensive. Please view at your own discretion. View Comments