#Sea Engineering
Inspection of outfall and transmission pipe at Hilo Wastewater Treatment Plant scheduled
Inspectors will look at the structural integrity, operational status and maintenance needs of the reinforced concrete pipe that discharges secondary disinfected treated effluent 4,400 feet from the shoreline at Puhi Bay. No impact to shoreline recreation is anticipated.
UPDATE: Salvage ship will attempt again to free grounded luxury yacht from Maui coastline
Honolulu-based Visionary Marine used a salvage ship late Sunday to attempt more than a dozen “pulls” of the grounded luxury yacht Nakoa during high tide. In the dark, and on the final pull, the vessel moved 10 to 20 feet.