Hawai‘i Department of Transportation announces the following 14 scheduled lane closures and road work projects on Big Island state roadways during the week of Oct. 19-24.
Cars are stuck in traffic because of tree trimming closing a lane on Highway 11 near Hilo. (Photo File: Kelsey Walling/Big Island Now)
* * * * * * * * *
HIGHWAY 11
MOUNTAIN VIEW
SINGLE LANE CLOSURE on Volcano Road possible in either direction between mile post 20 to 22, in the vicinity of North Glenwood Road, on Monday, October 27 to Friday, October 31 from 8 a.m. to 2 p.m. for mowing and shoulder work.
NĀʻĀLEHU
SINGLE LANE CLOSURE on Māmalahoa Highway possible in either direction between mile post 60 to 71, in the vicinity of Kahuku Ranch Road, on Monday, October 27 to Friday, October 31 from 8:30 a.m. to 3 p.m. for restriping, installation of centerline rumble strips and pavement markers.
PĀHALA
SINGLE LANE CLOSURE on Māmalahoa Highway possible in either direction between mile post 55 to 57, on Monday, October 27 to Friday, October 31 from 8 a.m. to 2 p.m. for cutting grass.
ARTICLE CONTINUES BELOW AD
ARTICLE CONTINUES BELOW AD
PAPA
SINGLE LANE CLOSURE on Māmalahoa Highway possible in either direction between mile post 85 to 96, in the vicinity of Old Māmalahoa Highway and Kaohe Road, on Monday, October 27 to Friday, October 31 from 8:30 a.m. to 3 p.m. for removal of existing striping, installation of centerline rumble strips, new striping, and pavement markers.
SINGLE LANE CLOSURE on Māmalahoa Highway possible in either direction between mile post 97 to 100, in the vicinity of Haleili Road, on Monday, October 27 to Friday, October 31 from 8 a.m. to 2 p.m. for cutting grass and shoulder work.
VOLCANO
SINGLE LANE CLOSURE on Volcano Road (Route 11) possible in either direction between mile post 27.5 to 28.5, in the vicinity of Hawaii Volcanoes National Park and Crater Rim Drive, on Monday, October 27 to Friday, October 31 from 7 a.m. to 4 p.m. for HELCO installing new powerline poles.
HIGHWAY 19
KAWAIHAE
SINGLE LANE CLOSURE on Kawaihae Road possible in either direction between mile post 58 to 64, in the vicinity of Ko Uka Street, on Monday, October 27 to Friday, October 31 from 8 a.m. to 2 p.m. for cutting grass, tree trimming, and shoulder work.
ARTICLE CONTINUES BELOW AD
PĀPAʻIKOU
SINGLE LANE CLOSURE on Hawaii Belt Road (Route 19) possible in either direction between mile post 5 to 7.5, in the vicinity of Kahoa Place and Kalaoa Camp Road, on Monday, October 27 to Friday, October 31 from 8 a.m. to 2 p.m. for shoulder work.
SINGLE LANE CLOSURE on Hawaii Belt Road (Route 19) possible in either direction between mile post 6.9 to 7.1, in the vicinity of Old Mamalahoa Highway, on Monday, October 27 to Friday, October 31 from 8:30 a.m. to 3 p.m. for installing new cable lines.
NĪNOLE
SINGLE LANE CLOSURE on Hawaii Belt Road (Route 19) possible in either direction between mile post 17 to 19, in the vicinity of Old Mamalahoa Highway, on Monday, October 27 to Friday, October 31 from 8 a.m. to 2 p.m. for cutting grass.
SINGLE LANE CLOSURE on Hawaii Belt Road (Route 19) possible in either direction between mile post 18.5 to 19, in the vicinity of Waikaumalo bridge, on Monday, October 27 to Thursday, October 30 from 8 a.m. to 2:30 p.m. for bridge maintenance.
HIGHWAY 190
WAIMEA
SINGLE LANE CLOSURE on Māmalahoa Highway (Route 190) possible in either direction between mile post 0 to 1, in the vicinity of Lindsey Road and Lalamilo Farm Road, on Monday, October 27 to Friday, October 31 from 8:30 a.m. to 3 p.m. for installing striping, lane lines, turn pockets and direction arrows.
ARTICLE CONTINUES BELOW AD
SOUTH KOHALA
SINGLE LANE CLOSURE on Māmalahoa Highway possible in either direction between mile post 12.2 to 16.4, on Monday, October 27 to Friday, October 31 from 8:30 a.m. to 3 p.m. for installing striping, lane lines, turn pockets and direction arrows.
HIGHWAY 2000
HILO
SINGLE LANE CLOSURE on Pūʻainakō Street possible in either direction between mile post 0.5 to 2.2, in the vicinity of Kanoelehua Avenue and Komohana Street, on Monday, October 27 to Friday, October 31 from 8:30 a.m. to 3 p.m. for striping, installing new raised pavement markers and traffic signal loops.
* * * * * * * * *
Lane closure schedules can change at any time without notice. All projects are weather permitting.
Stay in-the-know with daily or weeklyheadlines delivered straight to your inbox.
×
Comments
This comments section is a public community forum for the purpose of free expression. Although Big Island Now encourages respectful communication only, some content may be considered offensive. Please view at your own discretion. View Comments