#ensure pedestrian path meets safety standards

Pūʻainakō Street repaving project in Hilo extended through November

The project was previously estimated to be substantially completed by the end of this month. The state needs to re-evaluate the final configuration of the roadway to ensure the pedstrian path along the mauka side of the street meets safety standards.